Background Require manufacturer of turbine powered aircraft to develop checklist

Background

Require manufacturer of turbine powered aircraft
to develop checklist and procedure for


dual engine failure occurring at low altitude.

NTSB Safety Recommendation :

Hudson event:
Bird strike
Thrust Loss at 3000 ft AGL
Touchdown 3 minutes later
All 155 persons on-board safely evacuated

Page

Слайд 4

New Procedure Create new procedure EMERGENCY LANDING: To configure for

New Procedure

Create new procedure
EMERGENCY LANDING:
To configure for landing
when no time to

relight

Airbus Answer

Require manufacturer of turbine powered aircraft
to develop checklist and procedure for
dual engine failure occurring at low altitude.

Page

Слайд 5

ALL ENGINE FAILURE procedure Main Steps Initial Descent Starter Assisted

ALL ENGINE FAILURE procedure

Main Steps

Initial Descent

Starter Assisted Relight

Approach
Forced landing - Ditching


Windmilling Relight

Descent at Green Dot

OLM 2012 - Emergency Landing / All Engine Failure

Page

Слайд 6

Creation “EMERGENCY LANDING” Scope Total thrust loss very close to

Creation “EMERGENCY LANDING”

Scope

Total thrust loss very close to the ground -

No time to relight
Remaining time to touchdown must be used to configure the aircraft for touchdown.

Page

Слайд 7

When to apply the different procedures Current procedures THRUST LOSS Engine Operative Page

When to apply the different procedures

Current procedures

THRUST LOSS

Engine Operative

Page

Слайд 8

When to apply the different procedures Enhanced procedures THRUST LOSS Engine Operative Page

When to apply the different procedures

Enhanced procedures

THRUST LOSS

Engine Operative

Page

Слайд 9

When to apply the different procedures Which QRH procedure? THRUST LOSS Engine Operative Page

When to apply the different procedures

Which QRH procedure?

THRUST LOSS

Engine Operative

Page


Слайд 10

When to apply the different procedures Engine Operative Page

When to apply the different procedures

Engine Operative

Page

Слайд 11

When to apply the different procedures Thrust loss Time to relight? Time to touchdown? Page

When to apply the different procedures

Thrust loss

Time to relight? Time

to touchdown?

Page

Слайд 12

When to apply the different procedures Thrust loss No longer

When to apply the different procedures

Thrust loss

No longer possible to

maintain level flight
Not always associated with the ECAM Alert:
ENG DUAL FAILURE

Apply QRH proc even if not prompted by ECAM

Page

Слайд 13

When to apply the different procedures Thrust loss Close to

When to apply the different procedures

Thrust loss

Close to the ground

?
Is touchdown imminent ?
Time to relight ?
Not only a matter of altitude but rather a matter of:
Time to touchdown
Flight crew workload:
Pilot judgment will determine what can be attempted to recover
Environmental conditions
(weather, day/night, terrain, ...)

Page

Слайд 14

When to apply the different procedures Thrust loss Scenario example: Page

When to apply the different procedures

Thrust loss

Scenario example:

Page

Слайд 15

When to apply the different procedures Thrust loss BANG Page

When to apply the different procedures

Thrust loss

BANG

Page

Слайд 16

Emergency Landing - Procedure Provides the minimum steps to land:

Emergency Landing - Procedure

Provides the minimum steps to land:
APU Start /

Landing Gear / Flaps / Speed target
Main steps of “Forced landing” or “Ditching” procedure of the All Engine Failure procedure.
Compromise:

Short
Straight Forward
Easy to apply

Covering as many cases as possible

Page

Слайд 17

Emergency Landing - Procedure OLM 2012 - Emergency Landing / All Engine Failure Page

Emergency Landing - Procedure

OLM 2012 - Emergency Landing / All Engine

Failure

Page

Слайд 18

Emergency Landing - Procedure Electrical Power Supply Gear - Flaps

Emergency Landing - Procedure


Electrical Power Supply

Gear - Flaps - Speed

Securing the

Aircraft
EMER EVAC PROC APPLY

Pitch - minimize Vertical Speed

“Brace for Impact”

Page

Слайд 19

Emergency Landing - Procedure Page

Emergency Landing - Procedure


Page

Слайд 20

Emergency Landing - Procedure Page

Emergency Landing - Procedure


Page

Слайд 21

Emergency Landing - Procedure Elec Page

Emergency Landing - Procedure

Elec

Page

Слайд 22

Emergency Landing - Procedure Gear Flaps Speed Page

Emergency Landing - Procedure


Gear
Flaps
Speed

Page

Слайд 23

Emergency Landing - Procedure Cabin Page

Emergency Landing - Procedure


Cabin

Page

Слайд 24

Emergency Landing - Procedure Mini V/S Pitch Page

Emergency Landing - Procedure


Mini V/S
Pitch

Page

Слайд 25

Emergency Landing - Procedure Secure A/C EMER EVAC Procedure Page

Emergency Landing - Procedure


Secure A/C
EMER EVAC Procedure

Page

Слайд 26

Contents Page

Contents

Page

Слайд 27

Conclusion EMERGENCY LANDING ALL ENG FAILURE Immediately accessible To configure


Conclusion

EMERGENCY LANDING
ALL ENG FAILURE
Immediately accessible
To configure the aircraft
When no

time to relight

New Procedure

Page

Имя файла: Emergency-Landing-All-Engine-Failure.pptx
Количество просмотров: 48
Количество скачиваний: 0