Clean – pressure drop and FLC temp stab. 0.4 sec.

Слайд 3

Clean – Change valve status 0.1 sec.

Слайд 4

Clean – flush pipette with zero 0.70 sec.

Слайд 5

Clean – rest for temp stab. 0.40 sec

Слайд 6

Clean – Change Valve status and temp stab. 0.60 sec

Слайд 7

Clean – Change Valve status 0.10 sec

Слайд 8

Clean – Flush By-Pass valve with Zero. HP = 2 stroke

Слайд 9

Clean – Flush Back Flush Valve with Zero. HP = 1 stroke

Слайд 10

Clean – Flush cuvette and blocking valve with Zero. HP = 1 stroke

Слайд 11

Clean – Change Valve status and rest for temp stab. 1.20 sec.

Слайд 12

Clean – Change Valve status 0.10 sec.

Слайд 13

Clean – Flush By-Pass Valve and Cuvette with Clean 1.10 sec.
Clean Pump

Speed = 3

Слайд 14

Clean – Flush Blocking valve with Clean 0.70 sec.
Clean Pump Speed =

2

Слайд 15

Clean – Flush Backflush Valve and Cuvette with Clean 1.70 sec.
Clean Pump

Speed = 2

Слайд 16

Clean – Clean Pump stopped 0.40 sec.

Слайд 17

Clean – FLC to temp stab. and pressure drop 1.70 sec.

Слайд 18

Clean – Change Valve status. 0.10 sec.

Слайд 19

Clean – Flush pipette startup with Clean 0.10 sec.
Clean Pump Speed =

2

Слайд 20

Clean – Flush pipette with Clean 1.85 sec.
Clean Pump Speed = 1

Слайд 21

Clean – Flush pipette with clean - Standby 0.40 sec.

Слайд 22

Clean – Change Valve status and temp. stab. 1.60 sec.

Слайд 23

Clean – Cuvette Clean procedure - startup. 0.10 sec.

Слайд 24

Clean – Flush By Pass valve with Clean – HP = 4 stroke

Clean Pump Speed = 1

Слайд 25

Clean – Flush Back Flush valve with Clean – HP = 1 stroke

Clean Pump Speed = 1

Слайд 26

Clean – Flush Cuvette with Clean – HP = 1 stroke
Clean Pump

Speed = 1

Слайд 27

Clean – Temp. stab. and pressure drop. 2.00 sec.

Слайд 28

Clean – Change Valve status 0.10 sec.

Слайд 29

Clean – Flush By Pass valve with Clean – HP = 4 stroke

Clean Pump Speed = 1

Слайд 30

Clean – Flush Back Flush valve with Clean – HP = 1 stroke

Clean Pump Speed = 1

Слайд 31

Clean – Flush Cuvette and blocking valve with Clean – HP = 1

stroke
Clean Pump Speed = 1

Слайд 32

Clean – Temp. stab. and pressure drop. 2.40 sec.

Слайд 33

Clean – Change Valve status 0.10 sec.

Слайд 34

Clean – flush pipette with zero 2.30 sec.

Слайд 35

Clean – rest for temp stab. 0.40 sec

Слайд 36

Clean – rest for temp stab. and change valve status 1.60 sec

Слайд 37

Clean – Change Valve status 0.10 sec

Слайд 38

Clean – Flush By-Pass valve with Zero HP = 2 stroke

Слайд 39

Clean – Flush Back Flush Valve with Zero. HP = 1 stroke

Слайд 40

Clean – Flush cuvette with Zero. HP = 1 stroke

Слайд 41

Clean – Change Valve status and rest for temp stab. 1.20 sec.

Слайд 42

Clean – Change Valve status 0.10 sec.

Слайд 43

Clean – Flush Blocking Valve with zero 0.90 sec.

Слайд 44

Clean – Change Valve status 0.10 sec.

Слайд 45

Clean – Flush H-pump with zero 1.00 sec.

Слайд 46

Clean – Rest 0.40 sec.

Слайд 47

Clean – Rest and change valve status 1.60 sec.

Слайд 48

Clean – Finish