Construction of Reservoir, Sedimentation Tank & Irrigation System at Berry Farms in Uzbekistan презентация
Содержание
- 2. Agenda
- 3. Dashboard Legend: Base Line – Actual - Project Performance:- Reservoir 16/5 PV EV Data Line 20.02.2023
- 6. 09.02.2023 10.02.2023 11.02.2023 12.02.2023 13.02.2023 14.02.2023 15.02.2023 16.02.2023 Daily report of the number of machines 21.02.2023
- 7. Reservoir & Pre-Waterpool Photos:- Reservoir:- Roads were made for the smooth movement of machinery Excavation in
- 8. Irrigation System Photos:- Irrigation System:- Basically, Now, tranches of strawberry sub main lines are excavated almost
- 9. Overall length -25547 m = 100% (Total meter of excavation works) Done -2162 m = 8,5
- 10. Photos on progress Excavation works (meter)
- 11. Feb 6 Feb 28 Mar 31 Maximum completion time of the works 10 15 20 10
- 12. Feb 6 Feb 28 Mar 20 Maximum completion time of the works Sediment Basin and Water
- 13. Area of Concerns
- 14. Project Schedule (Reservoir) Legend: Base Line – Actual -
- 15. Project Schedule (Irrigation) Legend: Base Line – Actual -
- 16. Project Schedule (Irrigation)
- 17. Progress Photos
- 18. Progress Photos
- 19. On Appendix A