CC-Link IE Field Basic презентация

Слайд 2

CC-Link IE Field Basic - overview

CC-Link IE Field Network Basic is an factory

automation network using the standard Ethernet.

Data is periodically communicated between the master station and slave stations using link devices (cyclic transmission).

Слайд 3

CC-Link IE Field Basic – features

Easy system configuration

Using different protocols

Cost saving of the

system

Accessible devices

Слайд 4

Number of link points

The number of link points per slave station is 64

points for RX/RY and 32 points for RWr/RWw. However, by changing the number of occupied stations, RX/RY can be set to a maximum of 256 points in increments of 64 points and RWr/RWw can be set to a maximum of 128 points in increments of 32 points.

Слайд 5

Operation of the link scan

After sending the requests to all of slave stations

and subsequently receiving responses from all the slave stations, the master station starts the next link scan. Link refresh is performed in END processing after receiving responses from all the slave stations.

St: Scan time
Ls: Link scan
END: END processing
The master station sends a request to slave station 1 and slave station 2.
Slave station 1 sends a response to the master station.
Slave station 2 sends a response to the master station.
Once the master station has received responses from slave station 1 and slave station 2, the master station starts the next link scan.

Слайд 6

Operation of the link scan iQ-F

After sending requests to all slave stations, the

master station receives responses from slave stations in END processing. After receiving responses from all the slave stations, the master station performs link refresh and starts the next link scan.

St: Scan time
Ls: Link scan
END: END processing
The master station sends a request to slave station 1 and slave station 2.
Slave station 1 sends a response to the master station.
Slave station 2 sends a response to the master station.
Although the master station received responses from slave station 1 and slave station 2, the master station does not start the next link scan until link refresh is performed in END processing.

Слайд 7

Performance specification

Слайд 8

FR-A800-E Ethernet function selection

FR-A800-E CC-Link IE Field Basic specification:

Слайд 9

FR-A800-E IP address setting

Слайд 10

FR-A800-E IP filtering function

Слайд 11

IP address for command source selection

Слайд 12

IP address for command source selection

Слайд 13

FR-A800-E CC-Link IE Field Basic

FR-A800-E CC-Link IE Field Basic specification:

CC-Link extended setting

Слайд 14

FR-A800-E CC-Link IE Field Basic

Слайд 15

FR-A800-E CC-Link IE Field Basic

Слайд 16

GOT2000 & CC-Link IE Field Basic

Слайд 17

GOT2000 & CC-Link IE Field Basic

Имя файла: CC-Link-IE-Field-Basic.pptx
Количество просмотров: 63
Количество скачиваний: 0